user-friendly PC.
鈥?/div>
A newly-developed X-ray generator is used,
providing extremely accurate measurement
results with a quick response time. The
TOSGAGE-7525 focuses X-ray beams finely in
the strip width direction to improve thickness
resolution in the strip width direction, and
making it suited to measuring the shape of the
section of measured materials.
The TOSGAGE-7525 can also be used as a AGC
backup for when the fixed thickness gage
(TOSGAGE-7521/7522) has failed.
Configuration
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶VVS
3C 5.5S(AC200V)銆€
銆€銆€銆€ 鈶VVS
2C 3.5S(AC200V)銆€銆€銆€銆€銆€銆€鈶燙V 3C 3.5S(AC200V,1蠁)
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€鈶矯VVS
8C
1.25S
35
NC-HIV 8S
鈶VVS
3C 8S(AC100V)
鈶VVS
2C 3.5S(AC100V)
鈶?/div>
Special cable (power)
* Measuring head
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶VVS
20C
1.25S(Signal)
鈶?/div>
Special cable (Signal)
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶?/div>
Special cable (Signal)
(Customer's
鈶VVS 10P 1.25S(Signal)
D-type
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶?/div>
Special cable (Snet)
computer)
鈶?/div>
Special cable (motor power supply)
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶–VVS 10P 1.25S(Signal)銆€銆€銆€銆€銆€銆€銆€銆€CVVS
4P
1.25S(Signal)
22
PG
M B
23
CVVS 20C
1.25S(Signal)
鈶?C-2V-CCY
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶?/div>
CVVS 2C 2S (reverse limit)
29
CVVS
10P 1.25S銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€AUI銆€銆€銆€銆€AUI
26
27
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
24
鈶?/div>
CVVS 2C 2S (forward
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
銆€銆€銆€銆€銆€(PG
Signal)銆€銆€銆€銆€銆€銆€銆€銆€銆€AUI
Transceiver
Bridge
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
鈶?/div>
CVVS 2C 2S (standby)
34
Transceiver
* Limit switch
30
CVVS 2C 2S (line center)
25
Transceiver
21
NC-HIV 8S銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€AUI
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€ 銆€
NC-HIV 8S
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€10BASE5
Conditions
28
1. Apart from special cables
鈶?/div>
to
鈶?
all cables are
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
(Operation-PC)
the responsibility of the customer.
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€ 銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
C-type
D-type
2. Length of cable between equipment cabinet and
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€
Printer
33
NC-HIV
32
X-ray/shutter
* Driving control box
* Equipment cabinet
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€ 銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€*銆圓VR銆?/div>
warning lamp
Customer's
distribution panel
鈶?/div>
Special cable (PG signal)
automatic voltage regulator is 10m max.
8S D-type
3. Distance between automatic voltage regulator and
customer's distribution board is 10m max.
4. Length of cable between driving control box and
31
銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€銆€CV
3C 3.5S(AC100V,1蠁)
customer's distribution board is 100m max.
鈶V
3C 5.5S(AC200V,1蠁)
5. LAN and terminators are the responsibility of the customer.
(Hub) bridging and LAN separation are the responsibility of the
customer.
6. The application of flame-resistant cable (judgment and liability) is the responsibility of the customer.
7. Components marked * are standard configuration components.
Figure 1
Configuration and Cable Connections
No. EJD-069
7525相關(guān)型號PDF文件下載
-
型號
版本
描述
廠商
下載
-
英文版
X-ray Thickness Gage
TOSHIBA
-
英文版
X-ray Thickness Gage
TOSHIBA [T...